
Pipeline Integrity Assessment (ILI)
28" × 33km Gas Pipeline In-Line Inspection
CompletedNLNG · Ubeta–Rumuji T1, Rivers
The scope
Pigging, gauging, and in-line inspection of the 28-inch, 33-kilometre Ubeta–Rumuji T1 gas transmission pipeline.
- Gas transmission ILI
- Gauging & proving pre-runs